Mississippi...

Appalachian Corridor V:
The expressway from MS 25 in Fairview to the Alabama border to connect with Alabama Route 24
is planned in the STIP for construction. Engineering began in 2001, and ROW purchase began in 2004.
This will probably be designated at MS 76. The remainder of the corridor route runs along US 278 / MS 6.
Franklin Creek Road:
This 3/4-mile long arterial east of Moss Point connects the US 90 arterial to I-10 at Exit 75.
Sources:
Billy Riddle, Mississippi DOT, Chris Lawrence, AA Roads

Last Updated: 3/5/06
Comments:
Please send any comments, suggestions, corrections, additional information or
pictures about this page to:

|